PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Ductwork raiser at the 3rd floor Facing South-East.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg Installed copper piping at the 3rd floor Facing West.jpg Installed metal decking at Stair -3 4th Floor Facing North.jpg Weather strips at the curtain wall South elevation.jpg Erecting stone panels at the North Elevation.jpg
Previous pageNext page Weather strips at the curtain wall South elevation
Weather strips at the curtain wall South elevation